您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 项目/工程管理 > 斜拉索安装技术方案(新)
目录一、编制依据··································································································1二、工程概况··································································································1三、斜拉索挂索施工工艺············································································2四、斜拉索PE修补工艺.......................................9五、斜拉索张拉施工工艺············································································10六、质量保证措施························································································11七、工期保证措施························································································13八、安全保证措施························································································13九、附件········································································································15十、附图········································································································15中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第1页斜拉索安装技术方案一、编制依据1、《武汉天兴洲公铁两用长江大桥正桥——钢梁施工图》(共三册);2、《武汉天兴洲公铁两用长江大桥正桥——斜拉桥斜拉索总装配图》3、《铁路桥涵施工规范》TB10203-2002;4、《铁路桥涵工程施工质量验收标准》TB10415-2003;5、《客运专线铁路桥涵工程施工质量验收暂行标准》铁建设[2005]160号;6、《铁路工程施工安全技术规程》TB10401.1-2-2003(上下册);7、《建筑机械使用安全技术规程》JGJ33-2001;二、工程概况1、天兴洲大桥正桥为(98+196+504+196+98)米双塔三索面斜拉桥,上层为六车道公路,下层为四线铁路。斜拉桥主梁为板桁结合钢桁梁,上弦中部756米范围是正交异性钢板桥面,两端各168米范围是混凝土结合板桥面。桥塔为倒“Y”型混凝土塔,塔顶标高为+205m,承台以上塔高188.5m。2、全桥共设16对192根斜拉索,采用三索面空间索布置,斜拉索采用PES7-241、PES7-253、PES7-283、PES7-337、PES7-379、PES-409、PES-421、PES-451等八种规格三十二种型号。整股钢丝用高强缠包带缠紧后外挤双层双螺旋线HDPE护套,钢丝的抗拉标准强度Rby=1670MPa,最长索272.183m,最短索82.938m,单根索最大重量41.184t(钢丝重),两端均采用张拉冷铸锚具。张拉端设在塔内,同一号斜拉索要求上、中、下游、主、边跨六根索同时对称张拉。3、工艺适用范围本工艺的适用范围为天兴洲大桥2#墩(汉口侧)、3#墩(武昌侧)斜拉索(边跨边桁S1~S16、边跨中桁MS1~MS16、中跨边桁C1~C16、中跨中桁MC1~MC16号)的挂设及张拉。详见附图TQ-07-01:天兴洲大桥斜拉索布置图中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第2页三、斜拉索挂索施工工艺(一)、施工方案天兴洲大桥2#、3#墩塔柱封顶后进行斜拉索安装。根据施工现场塔顶吊架、塔旁塔吊的配置分为两种方式进行安装:A、1—6#斜拉索先挂塔端(1—4#斜拉索戴平锚杯螺母,5—6#斜拉索锚杯张拉杆副螺母锁紧),再通过20吨放索盘桥面展索,安装梁端并软牵引到位,最后5—6#斜拉索塔端刚性牵引到位(斜拉索戴平锚杯螺母)。B、7—16#斜拉索先根据桥面成型长度进行桥面展索,再通过塔顶吊架与塔旁塔吊的配合进行塔端挂设(斜拉索锚杯张拉杆副螺母锁紧),安装梁端并软牵引到位,最后塔端刚性牵引到位(斜拉索戴平锚杯螺母)。注:3#墩在4#斜拉索张拉完后边跨即达到合拢状态,后期3#墩边跨5#—16#斜拉索均可先进行桥面完全展索,再通过塔顶吊架与塔旁塔吊的配合进行塔端挂设,安装梁端并软牵引到位,最后塔端刚性牵引到位。挂索时各斜拉索锚杯安装牵引力表斜拉索编号项目1#2#3#4#5#6#7#8#中桁梁端戴帽(设计位置)索力(t)10.919.430.444.214.617.924.128.5塔端戴帽(平扣)索力(t)59.275.6102.1126.2边桁梁端戴帽(设计位置)索力(t)11.920.030.844.614.718.024.228.6塔端戴帽(平扣)索力(t)59.475.6102.5126.6斜拉索编号项目9#10#11#12#13#14#15#16#中桁梁端戴帽(设计位置)索力(t)35.040.546.051.659.266.578.686.2塔端戴帽(平扣)索力(t)146.9187.2209.5245.9294.4340.0412440边桁梁端戴帽(设计位置)索力(t)35.140.545.851.959.666.479.086.5塔端戴帽(平扣)索力(t)147.0187.2209.9245.5295.4340.0412.0440.0注:表中1—4#斜拉索在塔端安装时直接将锚杯锚固螺母旋入锚杯至平扣,故不存在塔端戴帽(平扣)索力;5—16#斜拉索在塔端安装时只是把斜拉索锚杯张拉杆副螺母锁中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第3页紧,锚杯锚固螺母距设计位置还有2m的距离,塔端戴帽(平扣)索力是在梁下安装完后进行塔上刚性牵引锚杯锚固螺母旋入锚杯至平扣时的牵引力。详见附图TQ-07-02:主塔斜拉索安装总体布置图(二)、设备配置1、塔顶塔顶装饰墙施工完毕后后,塔顶设置一个可以横桥向移动的Qp=40t吊架,在塔柱预应力爬架拆除后(7#—16#拉索),用于安装拉索塔端;在塔柱预应力爬架拆除前(1#—6#拉索),以塔吊为主吊装拉索,塔吊吊装的原则应满足塔吊的吊装曲线。塔顶吊架横向移动采用2台27t千斤顶;塔顶顶板共六个进人洞,其中三个进人洞处各布置一台5t卷扬机,用于塔内翻顶和拉索辅助牵引,另三个做为人员进出洞。详见附图TQ-07-16:塔顶吊架布置图2、塔柱内、外塔内平台主要采用普通钢管脚手架通长架设,每个箱室内由塔顶至1#斜拉索齿块处设"Z"型永久楼梯,休息平台垂直距离2m,楼梯立柱四周设安全网。在1#至5#、7#、9#、11#、13#、15#斜拉索齿块各设一操作平台,作为人员操作和张拉设备的承载平台。单塔张拉设备含三台1200t千斤顶(主要负责边跨张拉)、三台1500t千斤顶(主要负责中跨张拉)、六台10升电动油泵、六台1500t张拉撑脚及张拉杆等配件,用于塔端刚性牵引(5#—16#斜拉索)、施工索力张拉及索力调整。每个塔柱箱室内配一套灭火设施(可采用干式灭火器或砂箱)。详见附图TQ-07-12:塔内平台结构图塔外采用自升降吊篮做为活动平台,便于操作人员下到塔柱外侧拆除索体上吊点及后期减震器的安装等相关塔外作业。在塔柱预应力爬架未拆除前,自升降吊篮依附于预应力爬架上;在塔柱预应力爬架拆除后,将自升降吊篮依附于塔顶活动吊架上。自升降吊篮选用无锡市小天鹅建筑机械厂生产的ZLP800A高处作业吊篮。详见附件:ZLP系列高处作业吊篮产品资料(共5张)3、梁面单塔梁面布置20t、50t放索盘各2台,单轴小车若干,10t卷扬机4台用于梁面放索及牵引。卷扬机布置在梁面前端,将10t卷扬机牢固地固定在桥面上,采用Ф28㎜钢丝绳,并在前端设20t转向滑车,钢丝绳通过转向滑车与梁端牵引滑车组(40t或20t)中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第4页斜拉索进入施工现场验收运输上桥梁上放索塔端挂设联结。详见附图TXA-05:放索盘结构图附图TXA-06:放索锚头小车结构图附图TXA-07:放索小车装配图1~8#斜拉索采用一台10t卷扬机通过滑车组(40t)进行牵引;9~16#斜拉索采用两台10t卷汤机同时通过滑车组(40t、20t)进行牵引。一是分散栓索的受力点;二是互作保险以策安全。根据索号的不同将斜拉索牵引至距梁端锚垫板2.5m~13m时,连接软牵引体系。单套软牵引体系包括250t内嵌式千斤顶一台、2升电动油泵一台、锚杯连接器一个、单端挤P锚钢绞线5—12根及工具锚环一个,每个主塔墩配4套软牵引体系。4、梁端中、边桁在钢桁梁下层架设普通钢管脚手架平台,用于设置软牵引体系安装斜拉索梁端索头,同时在梁上索导管处设置导向托架、梁上吊架或汽车吊,用以在梁下软牵引时调节斜拉索进入索导管的角度。详见附图TQ-07-17:梁面吊架布置图附图TQ-07-14:梁下边桁管架示意图附图TQ-07-13:梁下中桁管架示意图(三)、斜拉索安装工艺1、工艺流程中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第5页梁面卷扬机牵引千斤顶软牵引梁下锚杯到位塔端刚性牵引锚杯戴平扣张拉索力调整2、斜拉索运输与上桥后放索:(1)、斜拉索的存放、运输及上桥:①、斜拉索存放时索体下端应辅设方木支垫,并在方木与索体间加一定厚度的软质隔离物(如棉毡等),不允许斜拉索直接与梁面或地面接触,索体周围10米内严禁存在火源,如确需在索体周围焊接、气割,作业前必须对相关人员进行安全交底,并同时配备灭火装置。各斜拉索应按编号分开,避免搞错。②、成盘斜拉索从存放位置通过水运至主塔墩旁(下游方向),用120t浮吊起吊至主塔墩两侧的下游侧桥面上,其中1—6#斜拉索对应放置于中跨与边跨桥面上;7—16#斜拉索反方向放置于中跨与边跨桥面上的50t放索盘(2台放索盘分别放在主塔墩下游侧靠近1#斜拉索梁面索导管的位置处)上,此时120t浮吊需在主塔墩下游侧进行顺桥向短距离的移动,便于后期放索。③、成盘斜拉索起吊时设3个吊点,使用专用的吊装带,严禁用钢丝绳直接兜在斜拉索上,以避免损坏PE护套。若发现PE护套有损伤应及时修整。(2)、放索:主梁每节段均为6根斜拉索,待挂成盘斜拉索放置在放索盘上,置于塔下桥面上。①1—6#斜拉索置于20t放索盘上,在塔端挂好后,通过梁端设置的10t卷扬机牵引20t放索盘顺桥向移动进行桥面展索,在展开的索体下间隔4-5m放置一台单轴小车,索体与小车之间铺垫橡胶皮以防护索体损伤。卷扬机牵引放索盘直至固定端锚杯脱离放索盘,安装锚杯哈夫夹并用汽车吊将锚杯置于锚头小车上,即完成1—6#斜拉索的放索中铁大桥局天兴洲长江大桥工程指挥部2#、3#墩斜拉索安装技术方案中铁大桥(郑州)缆索有限公司第6页工作。②7—16#斜拉索采用50t放索盘放索,索体加50t放索盘的重量在37t—61t之间,根据现有桥面板的状况,50t放索盘不设置走行轮直接放在桥面板上,以防损伤桥面板,同时放索盘下垫短钢板操平以利于放索盘放索。边跨斜拉索置于塔柱中跨放索盘上放索,中
三七文档所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
本文标题:斜拉索安装技术方案(新)
链接地址:https://www.777doc.com/doc-4792582 .html